SDLG75
SDLG75
SDLG75
SDLG75
SDLG75
SDLG75
SDLG75
SDLG75
SDLG75

SDLG75

SDLG75
SDLG75
SDLG75
SDLG75
SDLG75
SDLG75
SDLG75
SDLG75

Tonnage (tons) 7
Machine operating weight (kg) 7460
Bucket capacity (m³) 0.3
Boom length (mm) 3720
Arm length (mm) 1622
Performance
Slewing speed (rpm) 10
Traveling speed (km/h) 5.4/2.9
Gradability (%) 35
Ground pressure (Kpa) 33.5
Bucket digging force (kN) 57
Arm digging force (kN) 38
Maximum traction force (kN) 68.3
Power system
Engine model V2607-DI-TE3B
Rated power (kw/rpm) 43/2000
Maximum torque (N.m) 225.8
Displacement (L) 2.615
Number of cylinders (pieces) 4
Hydraulic system
Pilot oil circuit (MPa) 3.5
Working hydraulic oil circuit (Mpa) 28
Traveling hydraulic circuit (Mpa) 27.4
Slewing hydraulic circuit (Mpa )20.6
Oil capacity
Fuel tank (L)130
Hydraulic oil tank (L)76
Engine oil change amount (L)10
Main body size
Total length for transportation (mm)6150
Total width for transportation (mm)2230
Total height for transportation (mm)2685
Onboard width (mm)2070
Track ground length (mm)2195
Track shoe width (mm)450
Track gauge (mm)1750
Minimum ground clearance (mm)380
Counterweight ground clearance (mm)815
Operating range
Maximum digging radius (mm)6260
Maximum digging depth (mm)4020
Maximum digging height (mm)7085
Maximum unloading height (mm)5160
Maximum vertical digging depth (mm)2920
Bulldozer blade width×height (mm)2200×396

Related Products

nodata

Send Message

If you need our products please write down any questions, we will reply as soon as possible.

  • *

  • *

  • *

  • *

Home Tel Mail Inquiry